IEC 61850-4:2011
Communication networks and systems for power utility automation - Part 4: System and project management
| Edition date: |
2011-04-11
In Force
|
|---|---|
| Available languages: | English, French |
| Summary: | IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems.
This publication is of core relevance for Smart Grid. La CEI 61850-4:2011 s'applique à des projets associés aux procédés proches des systèmes d'automatisation des compagnies d'électricité (UAS), par exemple les systèmes d'automatisation de poste (SAS). Elle définit la gestion du système et la gestion de projet pour les systèmes UAS avec communication entre des dispositifs électroniques intelligents (IED) dans le poste ou le site ainsi que les exigences concernant les systèmes associés. La présente seconde édition constitue une révision technique avec des détails plus proches des autres parties de la série de Normes CEI 61850. Le domaine d'application porte non seulement sur les systèmes d'automatisation de poste, mais aussi sur tous les systèmes d'automatisation pour les compagnies d'électricité. This publication is of core relevance for Smart Grid. |
| ICS: | 33.200-Telecontrol. Telemetering (SCADA) |
| CTN: | TC 57 - 1273 |
|
Standards Cancellations |
Anula a IEC 61850-4:2002 |
|
Modificaciones Normas |
Es modificada por IEC 61850-4:2011/AMD1:2020 |










