IEEE 336-2020
IEEE Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities
| Fecha edición: |
2020-10-30
En Vigor
|
|---|---|
| Idiomas disponibles: | Inglés |
| Keywords: | Class 1E|configuration management|constructability reviews|functional testing|IEEE 336|inspection procedures|multi-unit|nuclear facilities|plant design bases|pre-installation|post-installation inspection|post-maintenance test|post-modification test|test plans|test procedures |
| Scope: | Revision Standard - Active. Considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, or maintenance are provided in this recommended practice. This recommended practice does not apply to periodic surveillance testing. For purposes of this recommended practice, in addition to a nuclear power plant, a nuclear facility is defined as a facility related to the nuclear fuel cycle from fuel processing to reprocessing and waste management. |
| ICS: | |
| CTN: | |
|
Anulaciones Normas |
Anula a IEEE 336-2010 |
|
Otras Relaciones |
Relaciona con IEEE 1819-2016 |










