DIN 18234-4:2022-12
Fire safety of large roofs for buildings - Fire exposure from below - Part 4: List of roof penetrations and roof edges, which fulfil the requirements of DIN 18234-3 without further provision of evidence / Note: Date of issue 2022-11-18*Intended as replacement for DIN 18234-4 (2018-05).
| Edition date: |
2022-12-01
In Force
|
|---|---|
| Available languages: | German |
| Summary: | This document contains penetrations, connections and terminations that meet the requirements of DIN 18234-3 without fire testing. Building physics aspects are to be considered separately. In the event of deviations in the design details of a penetration, connection or termination to be executed within the meaning of this standard from the design specifications listed in this standard, separate proof of suitability in accordance with DIN 18234-3 must be provided. |
| Keywords: | Built-up roofing|Connections|Construction|Edge|Endings|Fire load|Fire safety|Fire spread prevention|Fire tests|Homogeneous|Industrial construction|Limitations|Lists|Penetrations|Proof of suitability|Roof area|Roof coverings|Roof lead-throughs|Roof sealing|Roofs|Sealing|Specification (approval)|Stress by fire|Structural fire protection|Structures|Testing |
| ICS: | 91.060.20-Roofs, 13.220.20-Fire protection |
| CTN: |










