AENOR Logo

Normas AFNOR

60781 Available results

Filtrar:

(38325)
(22456)
AFNOR

NF ISO 23991

In Force
2022-05-27
Irrigation applications of ductile iron pipelines - Product design and installation
AFNOR

XP CEN ISO/TS 23406

Cancelled
2024-05-01
Nuclear sector - Requirements for bodies providing audit and certification of quality management systems for organizations supplying products and services important to nuclear safety (ITNS)
AFNOR

NF EN ISO 7622-1

In Force
2013-08-03
Steel cord conveyor belts - Longitudinal traction test - Part 1 : measurement of elongation
AFNOR

NF EN 14250

In Force
2010-06-01
Timber structures - Product requirements by prefabricated structural members assembled with punched metal plate fasteners
AFNOR

NF EN 14637

In Force
2008-01-01
Building hardware - Electrically controlled hold-open systems for fire/smoke door assemblies - Requirements, test methods, application and maintenance
AFNOR

NF EN 13184

In Force
2001-11-01
Non-destructive testing - Leak testing - Pressure change method
AFNOR

NF EN ISO 24023-1

In Force
2020-05-27
Plastics - Plasticized poly(vinyl chloride) (PVC-P) moulding and extrusion materials - Part 1 : designation system and basis for specifications
AFNOR

NF EN ISO 19905-3

In Force
2022-06-29
Petroleum and natural gas industries - Site-specific assessment of mobile offshore units - Part 3: Floating units
AFNOR

NF EN ISO 15874-1/A1

In Force
2022-06-29
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 1: General - Amendment 1: Impact test
AFNOR

NF EN 17680

In Force
2023-08-02
Sustainability of construction works - Evaluation of the potential for sustainable refurbishment of buildings
AFNOR

NF EN ISO 15927-2

In Force
2009-12-01
Hygrothermal performance of buildings - Calculation and presentation of climatic data - Part 2 : hourly data for design cooling load
AFNOR

NF EN ISO 8430-3

In Force
2016-04-16
Resistance spot welding - Electrode holders - Part 3 : parallel shank fixing for end thrust
AFNOR

NF EN ISO 23996

In Force
2012-04-01
Resilient floor coverings - Determination of density
AFNOR

NF EN 12597

In Force
2024-10-23
Bitumens and bituminous binders - Terminology
AFNOR

NF EN 1253-4

In Force
2016-06-04
Gullies for buildings - Part 4 : access covers
AFNOR

NF EN ISO 23278

In Force
2015-07-24
Non-destructive testing of welds - Magnetic particle testing - Acceptance levels
AFNOR

NF T71-300

In Force
2023-01-07
Equipment for protection against water pollution by hydrocarbons - Skimmers - Data sheet - Standard lay-out
AFNOR

NF EN ISO 10070

In Force
2019-12-18
Metallic powders - Determination of envelope-specific surface area from measurements of the permeability to air of a powder bed under steady-state flow conditions
AFNOR

NF EN ISO 11202/A1

In Force
2021-05-19
Acoustics - Noise emitted by machinery and equipment - Determination of emission sound pressure levels at a work station and at other specified positions applying approximate environmental corrections - Amendment 1
AFNOR

NF ISO 21736

In Force
2020-12-11
Refractories - Test methods for thermal shock resistance
AFNOR

NF EN ISO 11600

In Force
2004-05-01
Building construction - Jointing products - Classification and requirements for sealants
AFNOR

NF EN 14761+A1

In Force
2008-10-01
Wood flooring - Solid wood parquet - Vertical finger, wide finger and module brick
AFNOR

NF EN 1527/IN1

In Force
2021-12-22
Building hardware - Hardware for sliding doors and folding doors - Requirements and test methods
AFNOR

FD ISO/TR 24679-5

In Force
2023-10-25
Fire safety engineering - Performance of structures in fire - Part 5: Example of a timber building in Canada
AFNOR

NF ISO 22863-8

In Force
2021-08-21
Fireworks - Test methods for determination of specific chemical substances - Part 8 : arsenic content by hydride generation atomic fluorescence spectrometry
AFNOR

NF DTU 60.2 P1-2

In Force
2007-10-01
Building works - Cast iron pipes for soil water, rain water and waste water drainage - Part 1-2 : general criteria for selection of materials
AFNOR

NF EN ISO 22282-6

In Force
2014-01-18
Geotechnical investigation and testing - Geohydraulic testing - Part 6 : water permeability tests in a borehole using closed systems
AFNOR

NF EN 16750/IN1

In Force
2020-08-19
Fixed firefighting systems - Oxygen reduction systems - Design, installation, planning and maintenance
AFNOR

NF EN 60300-3-3

In Force
2017-07-14
Dependability management - Part 3-3: application guide - Life cycle costing
AFNOR

NF EN 12966/IN1

In Force
2018-12-19
Road vertical signs - Variable message traffic signs
AFNOR

NF EN 13087-2

In Force
2012-04-01
Protective helmets - Test methods - Part 2 : shock absorption
AFNOR

NF DTU 53.12 P2

In Force
2020-12-04
Building works - Surface preparation and flexible floor coverings - Part 2 : contract bill of special administrative model clauses
AFNOR

NF EN 50628

In Force
2016-09-10
Erection of electrical installations in underground mines
AFNOR

NF EN 14187-2

In Force
2017-06-30
Cold applied joint sealants - Test methods - Part 2 : determination of tack free time
AFNOR

NF EN 14064-2

In Force
2010-04-01
Thermal insulation products for buildings - In-situ formed loose-fill mineral wool (MW) products - Part 2 : specification for the installed products
AFNOR

NF EN 61181

Cancelled
2011-04-16
Impregnated insulating materials. Application of dissolved gas analysis (dga) to factory tests on electrical equipment.
AFNOR

NF EN ISO 217

In Force
2013-09-14
Paper - Untrimmed sizes - Designation and tolerances for primary and supplementary ranges, and indication of machine direction
AFNOR

NF EN 81-21

In Force
2022-05-25
Safety rules for the construction and installation of lifts - Lifts for the transport of persons and goods - Part 21 : new passenger and goods passenger lifts in existing building
AFNOR

NF EN ISO 18113-3

Cancelled
2027-06-30
In vitro diagnostic medical devices - Information supplied by the manufacturer (labelling) - Part 3 : in vitro diagnostic instruments for professional use
AFNOR

NF ETS 300580-2

In Force
1998-09-01
Digital cellular telecommunications system (Phase 2). Full rate speech. . Part 2 : transcoding (GSM 06.10 version 4.1.1).